|
Cape Elizabeth
Bath Remodel
In this project were going to have the existing shower
gutted, and I'll install new Hardi Backer Board in
preparation for new "Subway Tile". Also, all existing tile
will be removed, and replaced with a more country style
"white" wainscoting with chair rail. Thirdly, the floor will
transformed from aged linoleum to a more easy to manage and
eye appealing floor tile, And finally, the countertop will
be replaced, another outlet will be added and the sinks will
be re-installed.
Existing Conditions

Entrance to bathroom
Sinks to be removed and re-installed

View #3
Shower door to be replaced

Leaky soap is the inspiration for this
project
View #6
View #7
Renovations Begin

Tile removal begins




Countertop and sheet rock removed
Ready for sheet rock

Ready for tile Board
Third Stage

Sheetrock ready for mud/taping

This area to receive wainscoting
Shower ready for tile installation


|