  Roswell Kitchen

Having recently moved into the home, the owners knew in advance the first priority to improving their new home was to remodel the kitchen. Also, with the existing pantry far across the room from the kitchen and closer to living room, the homeowner decided to modify the existing 1/4 bath into their new pantry location. So along with installing new cabinets, I'll be remodeling the existing bathroom and install a shelving system to create a much closer pantry to the kitchen area.


                                                                     

                                                                                  Before Pictures

 

 

 

                     

  Kitchen view 1                                                                                Kitchen view 2

 

 

 

                     

 Kitchen view #3                                                                                    Future location of pantry

 

 

   Kitchen view #5         

 

 

 

 

 

 

   

                   


 

                                          

                                                                    Work Begins

 

 

            

  Time to take down                                                                                            Ready for new cabinets

 

 

 

 

             

  Plumbers roughing in for gas cook-top and new sink                                       Cabinets have arrived

 

 

 

 

            

 Sneak peak of the Mahogany butcher block island                                          Cabinet install 30% complete

 

 

                    

 Corner pantry cabinet, oven cabinet next in line           Cabinet for oven to be modified

 

 

 

 

 Opening now created for double oven

 

 

           

 Shelf supports for double oven                                                                      Shelff reinforced for oven and going in place

 

 

 

 

 Soffit is framed and it's time to install soffit trim detail

 

 

         

 1/4 bath door removed and opening to be sealed off            Opening created for a pocket door to new pantry location

 

 

                

 Painting all parts and cabinets that will create the new pantry                               Pantry cabinets are now in place and ready for paint touch-up

 

 

 

              

 Granite tops are now in place and protected. Cabinets are all in.                       Time to install the backsplash and a hairbone pattern over cooktop

 

 

 

                

 In the laundry room we updated the utility sink with new cabinet and countertop    The first floor bath received a new vanity & sink along with a new toilet.

 

 

 

                               

  The old 1/4 bath entry now gone and pocket door to new pantry in place                            Entry to new pantry

 

 

 

                

 Final view of kitchen from old pantry area                                                          View from the living room                                                     

 


 

                                                                                                       Final Product  

 

 

                   

 

                   

                   BRAND NEW KITCHEN COMPLETE